Commercial Heating, Air Conditioning and Refrigeration Projects
Project: Merrills Wharf – Piece Atwood (prime tenant) 2011
- Location: Portland, Maine
- General Contractor: Metric Corporation, Boston, MA
- Engineer: Mechanical Systems Engineers
- Architect: Winston-Scott Architects
- System: 5 story mill building on Portland waterfront. Largest LG VRF system in New England. 117,000 square foot renovation.
Project: Bethesda House – 2010 – Maine State Housing Green Building Standards
- Location: Kennebunk, Maine
- General Contractor: Pine Brook Corporation
- System: 48 unit Maine State Housing – Financial multi-family housing. LP Gas-fired, condensing boiler, variable frequency pumps, baseboard;plumbing
Project: University of New Hampshire – New Hampshire Hall 2008
- Location: Durham, NH
- General Contractor: Horne Construction Co, Inc.
- System: Design build renovation fo a 35,000 sq. ft. sports medicine facility. Plumbing and four pipe HVAC system, air to air heat exchangers, blower coils and fan coil units.
Project: Biddeford Savings Bank 2008/2009
- Location: Biddeford, Maine
- General Contractor: Risbara Brothers Construction
- System: 3-story 16,000sqft complete renovation, geothermal, 10 wells, ERV, computer room, DDC Controls office building.
Project: Custom House
- Location: Portland, Maine
- General Contractor: Wright-Ryan Construction, Inc.
- System: 5-story office building, 78,000 sq. ft., design build, VAV’s, Splits, DDC controls.
Project: Saco-Biddeford Savings Bank
- Location: Saco, Maine
- General Contractor: Trades Center
- System: Renovation, VAV reheat
Project: Spencer Press
- Location: Wells, Maine
- General Contractor: Owner
- System: Design build, chilled water / hot water, 4 pipe.
- Office addition 17,000 sq. ft., Bindery 50,000 sq. ft.
Project: Hilton Garden Inn
- Location: Freeport
- General Contractor: TRB Development Group, Inc.
- System: Hydronic heat, Split HVAC Systems, Ventilation, 102 Rooms & Conference Center
Project: Saco Biddeford Savings Bank
- Location: Saco Industrial Park, Saco, Maine
- General Contractor: PM Construction Co., Inc.
- System: 3 Story Operations Center, Green Building, Plumbing & HVAC
- Hydronic raised floor VAV pressurized system, continual maintenance.
Project: Citigroup
- Location: Saco, Maine
- General Contractor: N/A
- System: Computer/Communications systems.
|
|
|